Quality and certificates

Our management system is certified to ISO 9001, ISO 14001 and ISO 45001. Factory production control is certified to EN 1090 for structural components up to EXC3, and welding to EN ISO 3834-⁠2.

Audited by
TÜV Rheinland Bulgaria and TÜV Rheinland Polska
ISO 9001
Certified since 08.07.2005
EN 1090
Structural components up to EXC3
Welding
EN ISO 3834-⁠2, valid to 04.11.2029
PED
Module G, item by item

Verify our ISO and EN ISO 3834-⁠2 certificates on TÜV Rheinland Certipedia (opens in a new tab) ID 9105031549

Certificates

Select a certificate to see it at full size with its number, issuing body, validity and scope.

Registrations in Bulgaria

DAMTN

State Agency for Metrological and Technical Supervision

Registered for maintenance, repair and reconstruction of boilers, pressure vessels, steam, hot-water, oil and gas pipelines, gas and LPG installations and lifting equipment.

Bulgarian Construction Chamber

Central Professional Register of the Builder

Entered for buildings, energy and utility infrastructure, and construction and installation works.

{{cvAlt}}
{{cvCount}}

{{cvTitle}}

{{r.k}}
{{r.v}}

Shown for information. The full certificate is available on request.

Documentation for each order

With each order we hand over a QA dossier and the welding records for that order.

Typical QA dossier

The content of the dossier varies according to the client's requirements.

  • Inspection and test plan (ITP)
    Agreed before fabrication starts, with your hold and witness points
  • WPS, PQR and welder qualifications
    Welding coordinated under EN ISO 3834-⁠2
  • Material certificates and traceability
    Full material traceability, as on the furnace combustion chamber for a district heating plant in North Macedonia
  • NDT, dimensional and coating reports
    Signed off against the agreed acceptance criteria
  • DoP, DoC and CE marking
    As-built documentation at handover

Welding

Our welding coordinator is qualified IWE/IWI and keeps the list of qualified welding procedures.

Welder at work during the electrofilter erection in Spain

Welding to EN ISO 3834-⁠2

Standard
EN ISO 3834-⁠2, comprehensive quality requirements
Processes
MMA, MAG and TIG
Stations
21 for MIG/MAG, TIG and MMA, plus an orbital pipe welder up to Ø 610 mm
Workshop and machines

Coordination and qualifications

Coordination
Responsible welding coordinator qualified IWE/IWI
Procedures
25 qualified welding procedures (list of 02/2024), most witnessed by TÜV Rheinland Bulgaria
Range
Plate, pipe butt, branch and pipe-to-plate joints, including stainless to carbon steel; thicknesses up to 50 mm
Welders
Qualified by notified bodies under PED; each qualification is confirmed every 6 months

Inspection and testing

Inspection follows the inspection and test plan (ITP) of each order. Acceptance criteria are agreed with the client.

Inspection

Stages
Incoming, in-process and final inspection
At receipt
100% check of documents and material, with traceability by material certificate and heat number
ITP
Hold, witness, review and spot points, signed off by our QC, third-party inspection and the client
Dimensions
Visual and dimensional checks; trial assembly of the first piece in a series
Pressure test
Hydrostatic tests of vessels and pipelines
Final
Final inspection report with DoP or DoC
CE marking
DoP for EN 1090 components

Non-destructive testing

In-house
VT and PT by our own staff, certified Level 2 by RINA Services
Outsourced
MT, RT and UT by accredited NDT laboratories
Reports
Issued in Bulgarian and English

Coating and surface

Blasting
Sa 2½, or Sa 3 where specified
Chlorides
Below 20 mg/m² before coating (C5 systems)
Climate
Temperature, humidity and dew point recorded at application
DFT
Measured per coat with calibrated electronic gauges; C5M system at least 240 µm
Adhesion
Pull-off or cross-cut tests
Galvanizing
Coating thickness checked
Stainless
Passivated and checked by copper sulphate test

Health, safety and environment

Risk assessments cover our workshop in Burgas and our project sites.

Safety rules and risk assessment

Our Occupational Health & Safety Policy Manual sets out responsibilities, training, risk assessments, first aid, PPE, fire safety and the rules on drugs and alcohol.

88 written safety instructions

They cover hot work, work at height, scaffolds, cranes and rigging, gas cylinders, chemicals, electrical work, excavation, winter work and PPE.

Incidents and near misses

Accidents and near misses are reported, registered and investigated. Each investigation records the root cause and the corrective actions.

Emergency plan and drills

We keep a written plan for disasters and accidents and hold practical drills. The drills are recorded.

Subcontractors

Subcontractors must have an HSE policy and system, provide health risk assessments and evidence of medical fitness, and accept our HSE audits.

Waste

Waste is segregated by stream. Scrap steel goes to recycling, oils and solvents are handled as hazardous waste, and we use licensed contractors.

Co-financed by the European Union. Kozloduy Ltd. implements a project under procedure “Introduction of Industry 4.0 technologies in enterprises”, No BG16RFPR001-1.008-0255-C01. Programme Competitiveness and Innovation in Enterprises